Project Description
At the time held concrete pumping record for NYC, pumping 5,100’ from 34th street and 11th Avenue (street level) to the existing 41st Street, 7 Line Subway station, at track level. Pumped 3,100’ of new track invert concrete base. Pumped 25,600’ of new track duct benches and 760’ of new overhead duct bench. Assisted in the initial construction operations for the New Mezzanine and Platform Levels and the start‐up of various sites including: Site A (26th Street/11th Avenue), Site J (34th Street and 11th Avenue), Site
K (35th Street and 11th Avenue) and Site L (41st Street and Dyer Avenue), focusing primarily on Site P (between 34th street and 35th street and 11th Avenue) and the running tunnels.
Owner
Metropolitan Transportation Authority
Contract Amount
$513,000,000
GCCOM Principal
Rafael Perez, Jr.
Project Superintendent
Skanska USA Civil, N.E., 2011‐2012