Project Description

At the time held concrete pumping record for NYC, pumping 5,100’ from 34th street and 11th Avenue (street level) to the existing 41st Street, 7 Line Subway station, at track level. Pumped 3,100’ of new track invert concrete base. Pumped 25,600’ of new track duct benches and 760’ of new overhead duct bench. Assisted in the initial construction operations for the New Mezzanine and Platform Levels and the start‐up of various sites including: Site A (26th Street/11th Avenue), Site J (34th Street and 11th Avenue), Site
K (35th Street and 11th Avenue) and Site L (41st Street and Dyer Avenue), focusing primarily on Site P (between 34th street and 35th street and 11th Avenue) and the running tunnels.

Owner

Metropolitan Transportation Authority

Contract Amount

$513,000,000

GCCOM Principal

Rafael Perez, Jr.

Project Superintendent

Skanska USA Civil, N.E., 2011‐2012